<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>KAVORTE — Guides for buying reactors from China</title><link>https://www.kavorte.top/en/blog/</link><description>Short, specific answers to the questions that decide whether an order goes right. Written for buyers — not optimised for search engines.</description><language>en</language><item><title>Glass-lined reactor thermal shock limits in practice</title><link>https://www.kavorte.top/en/blog/glass-lined-reactor-thermal-shock-limit.html</link><guid>https://www.kavorte.top/en/blog/glass-lined-reactor-thermal-shock-limit.html</guid><description>Cold shock ≤ 110 °C and heat shock ≤ 120 °C are guarantees, not guidelines. Here is what each number protects, where plants break it, and how to keep the lining intact.</description><pubDate>2026-10-01T08:00:00+08:00</pubDate></item><item><title>Reactor pre-shipment inspection checklist: 12 steps</title><link>https://www.kavorte.top/en/blog/reactor-pre-shipment-inspection-checklist.html</link><guid>https://www.kavorte.top/en/blog/reactor-pre-shipment-inspection-checklist.html</guid><description>A pre-shipment inspection is not a single report. Here are the 12 checks we walk through before a glass-lined, stainless or PTFE-lined reactor leaves China.</description><pubDate>2026-10-01T08:00:00+08:00</pubDate></item><item><title>What a 20 kV spark test on a glass-lined reactor proves</title><link>https://www.kavorte.top/en/blog/glass-lined-reactor-spark-test-20kv.html</link><guid>https://www.kavorte.top/en/blog/glass-lined-reactor-spark-test-20kv.html</guid><description>A 20 kV spark test finds pinholes that reach the steel. It says nothing about lining thickness, adhesion or chemical resistance — and without a serial-numbered record, nothing at all.</description><pubDate>2026-10-01T08:00:00+08:00</pubDate></item><item><title>How to choose between half-pipe, dimple and plain jackets</title><link>https://www.kavorte.top/en/blog/reactor-jacket-types-compared.html</link><guid>https://www.kavorte.top/en/blog/reactor-jacket-types-compared.html</guid><description>A plain jacket, a half-pipe coil and a dimple jacket differ on heat flux, pressure, cost and how close you can put two vessels. Here is how to pick, point by point.</description><pubDate>2026-10-01T08:00:00+08:00</pubDate></item><item><title>How to specify a glass-lined reactor: the six questions that decide your price</title><link>https://www.kavorte.top/en/blog/how-to-specify-glass-lined-reactor.html</link><guid>https://www.kavorte.top/en/blog/how-to-specify-glass-lined-reactor.html</guid><description>The same 3,000 litre reactor can be quoted at $4,000 or $12,000, and both prices can be defensible. Here is what actually moves the number — and what to ask before you accept either.</description><pubDate>2026-09-24T08:00:00+08:00</pubDate></item><item><title>Glass-lined or stainless steel? A straight answer based on your medium</title><link>https://www.kavorte.top/en/blog/glass-lined-vs-stainless-steel-reactor.html</link><guid>https://www.kavorte.top/en/blog/glass-lined-vs-stainless-steel-reactor.html</guid><description>The choice is decided by chemistry, not by budget. Here is where each material wins, and the specific conditions where the wrong choice becomes an expensive warranty dispute.</description><pubDate>2026-09-18T08:00:00+08:00</pubDate></item><item><title>Buying a reactor from China: the five checks that prevent a failed order</title><link>https://www.kavorte.top/en/blog/buying-reactor-from-china-checklist.html</link><guid>https://www.kavorte.top/en/blog/buying-reactor-from-china-checklist.html</guid><description>Most failed orders were visible months before shipment. Five checks — most of them free — catch the majority of them before money moves.</description><pubDate>2026-09-10T08:00:00+08:00</pubDate></item></channel></rss>