KAVORTE / Glass-lined vs stainless vs PTFE vs Hastelloy

Glass-lined vs stainless vs PTFE vs Hastelloy

Four materials cover most reactor duties. The medium decides which one, not the price list.

Material selection

What each one is for, and where it fails

MaterialFitsFails onRelative cost
Glass-lined steelHydrochloric and most mineral acids, chloride media, pharma and dye intermediatesHF, fluoride-bearing media, hot concentrated alkali, thermal shockLow to medium
316L stainlessClean media, food and pharma with no chloride presentChloride pitting, acidic service, iron pickup in the batchLow
PTFE-linedBroad acid and solvent resistance where glass would chipVacuum and high temperature together, mechanical damageMedium to high
Hastelloy C276Chlorides under oxidising and reducing duty, high temperatureCost. Very few duties justify itHigh

Cost order is indicative only. A real quotation depends on volume, pressure, jacket type and agitator.

How we decide

We ask three things before recommending anything: the medium and its concentration, the working temperature, and whether the vessel has to take thermal shock. Glass lining wins on acids and loses on fluorides and hot alkali. If your medium contains fluoride, we will tell you glass is wrong and quote something else.

The material is only half of it. Jacket type, agitator and seal decide whether the vessel works in practice. We specify those as a system against your duty.

Send the medium, the temperature and the volume. We answer with the material that fits.

Request a quote

Message Alex on WhatsApp