KAVORTE / Reactor specifications
Reactor specifications
What we build, and what is recorded before the vessel leaves the workshop.
Technical range
Standard range
| Item | Range or standard |
|---|---|
| Capacity | 50 to 30,000 litres |
| Shell | Carbon steel, glass lining fired to the shell |
| Lining thickness | Specified in mm per order, measured and recorded per unit |
| Heating | Jacket, inner coil, immersion tube or half-pipe |
| Agitator | Six types: paddle, anchor, disc turbine, hydrofoil, impeller, dispersion disc |
| Seal | Mechanical seal or gland packing, matched to pressure |
| Pressure test | Hydrostatic test, witnessed and recorded |
| Lining integrity | 20 kV spark test over the whole lining |
| Documents | Material certificates, test records, dimensional report, packing photos and video |
| Operating temperature | -19 to 180 °C |
Pressure and temperature limits are set per order against the medium and the jacket duty. We do not publish one figure that would be wrong for half the applications.
Not every duty suits glass
Glass lining is the wrong answer for hydrofluoric acid, fluoride-bearing media, hot concentrated alkali, and duties where nothing but a polished surface will do. In those cases we quote stainless, PTFE lining or Hastelloy instead.
Tell us the medium and the volume, and we will confirm whether glass lining fits before we quote.