KAVORTE /
Tell us the duty. Get the specification.
The more you tell us up front, the faster and more accurate the answer. If you have drawings, photographs of an existing vessel, or a competitor's quotation you want checked — send those too.
Direct contact
✉️
Email
[email protected]💬
WhatsApp / WeChat
+86 147 5361 1322🕐
Working hours
Monday to Saturday, 08:30 – 18:00 (GMT+8)
⏱️
Response time
Within one working day, with specification and price
What to include in your enquiry
- Application — industry, batch size or throughput, nominal volume
- Medium — name, composition, concentration, density, viscosity; whether fluoride ions or strong alkali are present
- Conditions — operating temperature and pressure (vessel and jacket), vacuum duty, heating and cooling media
- Configuration — sealing requirement, explosion-proof grade, agitator speed or mixing objective
- Interfaces — nozzle orientation and connection standard (GB / DIN / ANSI), destination voltage and frequency
- Certification — whether CE, ASME or a local mandatory certification is required
Inquiry form
Fill this in and press the button below — WhatsApp opens with your details already written out. Read it, then send. You can send it as an email instead if you prefer.
Trade terms
| Lead time | Approx. 45–50 days for standard configurations |
| Payment | T/T, L/C or D/P. New customers 30 % deposit + 70 % before shipment |
| Incoterms | EXW · FOB · CIF · CFR |
| Quote validity | 15 days, reflecting material and exchange-rate movement |
| Packing | Nude or crated; flat rack, break-bulk or RoRo by dimension |
| Export control | Glass-lined vessels of 100–20,000 L fall under China's dual-use export licensing. Please state end user and end use at enquiry stage. |