When an imported reactor goes wrong, the failure is rarely a surprise. It was usually a decision that nobody checked at the time. These five checks are cheap, and each one has caught real problems.
Check 1: the supplier's manufacturing licence
A workshop making pressure vessels should hold a special equipment manufacturing licence. Ask for a scan with the licence number visible, and check the scope covers pressure vessels and the material involved. A supplier who cannot produce this is not a manufacturer.
Check 2: the specification against your medium
Before comparing prices, confirm that every quotation describes the same thing: lining thickness, jacket type, seal type, agitator form, nozzle standard, design pressure and design temperature. It is common for a cheap quotation to be a different vessel wearing the same description.
Check 3: the test records, agreed in advance
Agree in the contract what will be tested and what you will receive: main seam radiography, hydrostatic test, dimensional inspection and the 20 kV spark test record for the lining. Records that are promised afterwards are frequently not produced.
Check 4: inspection before loading
Arrange for the vessel to be photographed and, ideally, physically inspected before it is crated. Once it is inside a container and on the water, the cost of discovering a defect is a return shipment.
Check 5: the licensing route, if it applies
Glass-lined reaction and storage vessels with a volume between 0.1 and 20 m³ fall under China's dual-use items export licensing regime. The licence takes time and must be applied for by a qualified party. Establish before signing who applies, how long it takes and who bears the cost — otherwise a finished vessel can sit in a yard for weeks.
The pattern is the same in every case: the problem was detectable at the time, and nothing in the process was designed to detect it. Five checks are cheaper than one container going back.